Monday, August 31, 2009

Brick work reaching lintel level





Brick work is reaching lintel level.Doors and windows are also being fixed along with brick work.29 rectangular columns are being concreted along with raising of brick work.These are projections of original concrete piling columns.Out of the total 31 pile columns two coming up in sit out area are being raised up as round columns.

A half HP motor is purchased and fixed with all acessories like suction and delivery hose for pumping water from well to be used for construction and related curing work.Pictures show work in progress

Monday, August 17, 2009

Brick work progressing


Pictures show brick work progressing with fixing of doors and window frames.Also final fixed picture of septic tank can be seen








Saturday, August 8, 2009

Brick work in progress


Picture show brick work in progress at site

Septic tank installation

Pictures show Ferrocement concrete septic tank large enough for two families being installed at site





Thursday, August 6, 2009

Ferrocement septic tank

Ferrocement concrete septic tank is being installed in the rear space as moving concrete septic tank in the rear will not be possible after the brick work moves up.Picture show earth work excavation for septic tank being done

Brick work progressing

After filling up basement of Foundation with red sand,brick work is being raised.Pictures show work in progress









Tuesday, August 4, 2009

Foundation work getting completed

After concreting Foundation beam brick work for basement done for a height of 27 cm.On top of this damp proof concrete with thickness of 10 cm done to prevent water seeping into floor of the house later.
Inside of Brick work for basement is plastered.After this red sand filling again is done for filling up of entire basement height upto the floor level of the house.Some amount of red sand filling also done for the rear of the compound to cover the mud filling using mud obtained during piling.
We have started brick work for the structure and for the northern wall,we have already reached Sill level(70Cm)