Sunday, March 29, 2009

Concrete piling completed







Concrete piling is completed on 26, March, 2009
Concreted piles will be left for curing and settling for about a week. After this period, we will excavate around each piles up to a depth of about 60 cm and the top of each pile will be chipped off to remove less strong portion in the top and then all pile columns will be raised by manually concreting up to a height of about 30 cm from the present road level which is the proposed ground level for the building
Pictures show final piling scenes