All but two pile columns in front of car porch are raised up to ground floor level.Pictures show work in progress.Front two pile columns will be raised with foundation beam so that entry of cars will not be obstructed
Now levelling of ground upto top of these raised columns start.After this levelling and levelling of the entire compound 30 cm above front road level extra red sand will be laid if required to reach uniform level
No comments:
Post a Comment